City Projects 2026

Highway 1 Lift Station

GENERAL WORK DESCRIPTION:    The work involves replacement of the Highway 1 sewage lift station, installation of approximately 40 feet of gravity sewer pipe, associated site work, and modifications to existing manholes.

Guadalupe Transit Hub

General Work Description: The work involves removing existing curb and/or gutter, sidewalk/walkways, driveways, curb ramps, asphalt and aggregate base, concrete pavement and aggregate, monument sign, trees, wall and pillars, various utility service, and railroad car. Installing new concrete curbs, driveway, sidewalks, ramps, reinforced concrete pavement, permeable roman pavers, class 2 aggregate base, signing and striping, new utility services, and other work indicated on the plans. 

PowerPoint Presentation by Wallace Group

Las Mujeres Park (Formerly Central Park) Renovation Project 

General Work Description: The work involves the renovation of Las Mujeres Park (formerly Central Park), including construction of a skate park, halft basketball court, bocce ball court, dog park, picnic areas, reconstruction of the existing parking lot, installation of pre-manufactured restroom, landscaping, and other items as specified in the Contract Documents. 

Guadalupe Jr. High Sidewalk

The work involves the construction of sidewalks and one curb ramp along Arroyo Secco Road.

Royal Theater Project 

Contact the Public Works Department

Dayanira Kamal Cruz
Engineering Technician
P: 805.310.9052

dcruz@ci.guadalupe.ca.us

David Trujillo
City Administrator
P: 805.356.3891
dtrujillo@ci.guadalupe.ca.us